Paver Patio Material Calculator
Enter your patio area and paver size to get the paver count, joint allowance, sub-base tonnage and bedding mortar you need to order.
Calculator Inputs
Material Breakdown
| Item | How it is worked out | Result |
|---|---|---|
| Patio area | Length × width | - |
| Paving pitch | Paver size + joint | - |
| Grid | Columns × rows, each rounded up | - |
| Pavers before waste | Columns × rows | - |
| Pavers to order | Before waste + waste allowance, rounded up | - |
| Sub-base volume | Area × depth | - |
| Sub-base weight | Volume × 2.0 tonnes per cubic metre | - |
| Sub-base bulk bags | Weight ÷ 0.85 t, rounded up | - |
| Bedding mortar | Area × bed depth | - |
| Cement | Bed volume × 1.33 ÷ 6 × 1,500 kg | - |
| Sharp sand | Bed volume × 1.33 × 5 ÷ 6 × 1,600 kg | - |
Scenario Analysis
| Scenario | Pavers to order | Sub-base | Cement bags |
|---|---|---|---|
| Your current spec | - | - | - |
Each row recomputes the whole calculation from the inputs above, so you can see what a tighter waste margin, a deeper base or a thicker bed does to the order before you buy.
Patio Laying Timeline
Measure and orderMeasure length and width, run them through this page, then order pavers, Type 1, sharp sand and cement with the 10% margin built in.
ExcavateDig roughly 150 mm below finished level across the footprint, down to firm subsoil, and dig out any soft pockets.
Build the sub-baseSpread MOT Type 1 in 50–75 mm layers, compact each one to reach 100 mm, and build in a fall of about 1:80 away from the house.
Bed and layScreed a full 30–40 mm mortar bed, prime the back of porcelain pavers, tap each unit to level and hold the joints at 8–10 mm.
Joint and cureWait 24–48 hours, fill the joints, then keep traffic off for another 24–48 hours before furniture goes out.
What Is a Paver Patio?
A paver patio is built from individual units — concrete blocks, brick paviours or cut stone — laid side by side on a prepared base rather than on a few dabs of mortar. Each unit is small enough to handle by hand, which is why pavers suit a DIY build, and the gaps between them are filled with jointing compound instead of being left open.
The finished surface is only the top 20–30 mm of the job. Below it sits a 30–40 mm mortar bed, a compacted sub-base of around 100 mm, and the excavated ground itself. This calculator covers the three things you actually order for that build-up: the pavers, the sub-base stone and the bedding mortar.
How Deep Should the Sub-Base Be?
Pave Direct specifies roughly 100 mm of compacted MOT Type 1 for a domestic patio carrying foot traffic, with 150 mm or more for driveways and anything taking vehicle loads. MOT Type 1 is a graded crushed aggregate defined by Clause 803 of the Department for Transport's Specification for Highway Works, running from about 40 mm stone down to dust so the particles lock together under compaction.
Two numbers matter when ordering. Type 1 loses roughly 20–25% of its loose depth when compacted, so finishing at 100 mm means spreading closer to 125–130 mm loose. The layer should also run 100–150 mm beyond the paved edge, otherwise the perimeter pavers sit half on stone and half on nothing. Compact in lifts of no more than 75–100 mm: a plate compactor tightens the top of a deep layer and leaves the bottom loose.
The Bedding Layer
The bed is a full mortar bed, not five dabs. Pave Direct specifies 30–40 mm of full-bed mortar for a patio, and 30–50 mm in its laying guide, mixed to a semi-dry consistency that holds its shape when squeezed. Spot bonding leaves voids under the paver, which crack, drum underfoot and collect water.
This calculator uses a 5:1 sand-to-cement mix, the ratio the CoryVu Sand and Cement Mix Calculator treats as the standard patio bedding mortar. At 5:1 with the industry 1.33 dry-bulking factor, the mixed density works out at about 2.11 tonnes per cubic metre, which matches the 2.12 t/m³ published for a 5:1 bedding mortar.
Ordering Pavers: Joints, Cuts and Waste
Pavers are laid on a pitch: paver size plus joint width. A 600 × 450 mm unit with a 10 mm joint occupies 610 × 460 mm of the layout, so a 6 m length takes 10 columns and a 4 m width takes 9 rows — 90 pavers. Because both counts round up, the final column usually needs cutting, and the pavers themselves cover slightly less than the full area once the joint gaps are subtracted.
Pave Direct builds a 10% cutting and breakage allowance into its own coverage calculator, which is why the default here is 10%. Order every paver from a single batch: colour varies between production runs, and a patio finished with a second batch is visible in low sun. Keep the off-cuts from the last column for the far edge.
Common Mistakes
Choosing a 50 mm base is the most expensive saving on this page: 50 mm is a path or border depth, and a patio on it moves with the ground. Laying straight onto soil or sand is the usual cause of a sunken, rocking patio, and one deep layer of Type 1 instead of several compacted lifts looks finished but is not.
Ordering the exact count is the second most common error. A layout of 90 pavers with no margin leaves nothing for a broken unit, a bad cut or a chipped edge found on delivery day. Ignoring the joint width has the same effect in reverse: adding 5 mm to the joint on a 10-column layout changes the pitch to 615 mm and can drop a column, changing the order count entirely.
What Happens Next?
Order the four materials together: pavers, MOT Type 1, sharp sand and cement. A bulk bag of Type 1 holds about 0.85 tonnes, and a 40 mm bed over 24 m² needs 13 bags of 25 kg cement plus about 1.7 tonnes of sharp sand, so most patio quantities fit in a couple of pallet deliveries and a few bags.
Plan two weekends for excavation and base work and one for laying, then joint once the bed has firmed for 24–48 hours. Keep foot traffic off for a further 24–48 hours after jointing. Finished paving should sit at least 150 mm below any damp-proof course and fall away from the building at about 1:80 — 12.5 mm of drop per metre — so check those two levels before the first paver goes down.
Set out where the water goes before you order. GOV.UK guidance treats a patio like any other paved area: in a front garden, more than 5 m² of impermeable paving needs planning permission unless the run-off drains to a permeable area such as a lawn, border or soakaway. Directing the fall into planting rather than the road keeps the job inside permitted development, and the guidance says the same drainage approach applies to patios at the side and rear of the house.
Method and Limits
The calculation is deliberately arithmetic you can follow. Pitch equals paver size plus joint; each dimension is divided by its pitch and rounded up; the pieces are multiplied, then increased by the waste allowance. Sub-base volume is area × depth at 2.0 tonnes per cubic metre, and bulk bags are that weight divided by 0.85 t and rounded up. Bedding volume is area × depth, split 1:5 into cement and sand after the 1.33 bulking factor, at 1,500 kg/m³ for cement and 1,600 kg/m³ for sharp sand.
Every count rounds up, never down: under-ordering mid-job costs more than a spare paver. The 2.0 t/m³ Type 1 figure is the site-consistent value used by the other CoryVu aggregate calculators, while Pave Direct quotes about 2.1 t/m³, so base tonnage here is marginally conservative. The mortar cross-check line uses the published 2.12 t/m³ for a 5:1 bed.
- Assumes a rectangular, stack-laid grid — curved edges, L-shapes, herringbone and basketweave patterns waste more, and borders add cut units; raise the waste allowance to 15% for a first patio with a complex edge.
- Does not model drainage, falls or damp-proof course clearance — the 1:80 fall and the 150 mm rule below a DPC are levels you set out on site, not quantities this page can calculate.
- Does not model ground conditions — clay, made ground or soft pockets may need a deeper base, a geotextile membrane or a trial hole before pricing.
- Does not model prices, delivery or labour — no currency appears on this page, so nothing here is a quote.
Figures checked 2026-10-27 against the Pave Direct sub-base and laying guides dated 29 August 2026, the Mainland Aggregates construction guide and the GOV.UK permeable-surfacing guidance first published 13 May 2009.
Frequently Asked Questions
How many pavers do I need for a patio?
Add the joint width to the paver size to get the pitch, divide each patio dimension by that pitch, round both answers up, then multiply. A 6 m by 4 m patio with 600 by 450 mm pavers and a 10 mm joint gives a 610 by 460 mm pitch, 10 columns and 9 rows, so 90 pavers before waste.
What joint width should I leave between pavers?
Keep joints consistent at 8 to 10 mm using spacers, which is the range Pave Direct specifies when laying paving. A wider joint takes more jointing compound and a thinner one leaves no room for cutting tolerance, so the calculator shows the effect of your choice on the grid.
How deep should the sub-base be for a patio?
About 100 mm of compacted MOT Type 1 for a domestic patio carrying foot traffic, and 150 mm or more where vehicles load it. The layer should extend 100 to 150 mm beyond the paved edge, and Type 1 loses roughly 20 to 25 per cent of its loose depth when compacted.
How much sand and cement do I need for the bedding layer?
A 40 mm full bed over 24 m² is 0.96 m³ of mortar. At a 5:1 sand-to-cement mix with the standard 1.33 bulking factor that is 319 kg of cement, so 13 bags of 25 kg, and 1,702 kg of sharp sand, about 1.7 tonnes.
Should I order extra pavers?
Yes. Pave Direct builds a 10 per cent cutting and breakage allowance into its own coverage calculator, and this page rounds every count up rather than down. Keep the off-cuts from the last column, and order all pavers from one batch so the colour matches.
Can I lay a patio on a 50 mm base?
No, not a patio. 50 mm is a path or border depth, and laying straight onto a thin base is the usual reason slabs rock and sink after the first winter. Select 50 mm here and the assessment flags the base as under-specified instead of quietly pricing it.
Sources
- Pave Direct: How to Lay a Patio Sub-Base (MOT Type 1 depths, compaction, 2.1 t/m³)
- Pave Direct: How to Lay a Patio (excavation depth, 30–50 mm bed, 8–10 mm joints, 10% waste)
- Mainland Aggregates: gravel driveway construction guide (100 mm minimum, 150 mm for vehicles)
- GOV.UK: Guidance on the permeable surfacing of front gardens (5 m² rule, drainage to a permeable area, applies to patios)
Sources and figures checked 2026-10-27. Densities and mix constants (2.0 t/m³ Type 1, 1.33 bulking, 1,500 and 1,600 kg/m³, 0.85 t bulk bag, 5:1 bed) are the same reference figures used by CoryVu's Sand and Cement Mix Calculator and Driveway Rock Calculator. This page gives an estimate only.