Garden Shed Base Builder
Pick your shed size, base type and ground to get the finished footprint, a full material order list and a build plan.
Calculator Inputs
Slab thickness applies to a concrete base, and the MOT sub-base toggle applies to concrete and paving bases.
Scenario Analysis
Every row recalculates the same order with one setting changed, so you can see what the choice costs before you buy.
| Scenario | Base area | Order headline | Change vs current |
|---|---|---|---|
| 0mm edge margin | - | - | - |
| Current settings | - | - | - |
| 200mm edge margin | - | - | - |
| 15% waste allowance | - | - | - |
| Without MOT sub-base | - | - | - |
Materials Breakdown
| Layer | Calculation | Result |
|---|---|---|
| Base footprint | Enter your shed size above | - |
| Base area | - | - |
| Surface layer | - | - |
| Surface materials | - | - |
| MOT Type 1 sub-base | - | - |
Building Your Shed Base: Step By Step
Mark out the basePeg the shed footprint, then set the pegs out by your edge margin — 100 mm on each side gives room for shuttering and a spade — and check the diagonals match before digging.
Excavate and lay the sub-baseDig down to roughly the slab thickness plus the sub-base depth (175 mm for a 100 mm slab on firm ground), spread the MOT Type 1 and compact it in two or three passes.
Prepare the surfaceConcrete: lay a damp-proof membrane, fix shuttering to level and pour to the top edge. Paving: lay a 30 mm sand bed and tap slabs to level with 10 mm joints. Timber: build the frame on level supports, then fix the deck boards.
Level and checkRun a straight edge across the surface and check fall away from the shed position, so rainwater leaves the base instead of pooling under the floor.
Build and cureLeave concrete 3–7 days before loading it (28 days to full strength), keep paving joints undisturbed for 24–48 hours, then erect the shed.
What A Garden Shed Base Actually Does
A base does three jobs at once: it spreads the shed's weight over ground that would otherwise rut or sink, it keeps the timber clear of standing water, and it gives you a square, level platform to build on. Most UK shed guides put a domestic shed on a 75–100 mm concrete slab, with 150 mm reserved for a workshop, a log cabin or anything carrying heavier equipment. The compacted MOT Type 1 sub-base underneath — 75–100 mm in the same guides — is what stops the surface cracking as the ground below cycles between wet and dry.
Concrete, Paving Slabs Or A Timber Frame Deck
Concrete is the cheapest route per square metre and the most rigid: at 100 mm over a typical 8.58 m² base you are ordering 0.94 m³ of C20, which is 3 bulk bags of ballast and 14 cement bags. Paving slabs cost more per square metre but need no mixing and can be laid in an afternoon — 5.36 m² takes 26 slabs at 450 mm with 10 mm joints, plus a 30 mm sand bed of about 0.18 m³. A timber frame deck keeps the shed highest off damp ground and is the easiest base to take apart again, but the frame itself is a carpentry job: this tool counts deck boards and edge boards, and refuses to size the joists.
How This Builder Works Out Your Quantities
Your shed size plus the edge margin gives the finished footprint, and length × width gives the base area — 3.05 m × 2.44 m with a 100 mm margin becomes 3.25 m × 2.64 m, or 8.58 m². Concrete volume is area × thickness × 1.10, then the C20 rates convert that to 2.0 tonnes of ballast per m³, 14 cement bags per m³ and 160 litres of water per m³, with every bag count rounded up. Paving divides the area by 0.2116 m², a 450 mm slab plus its 10 mm joint, and the sand bed is area × 30 mm × 1.10 at 1.6 tonnes per m³. The sub-base is area × depth × 1.10 × 2.0 tonnes per m³, where depth follows your ground: 75 mm firm, 100 mm soft, 150 mm sloping.
Preparing Soft, Sloping Or Poor Ground
Soft or clay ground is where bases move. Compacting 100 mm of MOT Type 1 instead of 75 mm gives the slab a wider, better-drained platform, and Type 1 loses roughly 20–25% of its loose depth as it compacts, so order the tonnage rather than judging depth by eye: 8.58 m² at 75 mm is 1.42 t, about 2 bulk bags. On sloping ground the 150 mm sub-base allowance absorbs the build-up needed to reach a level platform, and the 15% waste row in the scenario table shows what a rougher excavation does to your order. Neither replaces a levelling check with a spirit level and a straight edge before the surface goes down.
Common Shed Base Mistakes
Ordering to the exact shed footprint with no edge margin leaves nowhere for shuttering, cuts or access, and it is the most common reason an order runs short halfway through. Other regular ones: skipping the sub-base on soft ground, pouring a 75 mm slab under a 10 m²+ workshop, adding water until the mix is sloppy, and building on a slab after 2 days instead of 3–7. Buying by count rather than weight trips people up too — this tool quotes 0.85 t per bulk bag, while suppliers vary between about 0.8 t and 0.85 t, so check the figure on your invoice.
What To Do Next
Order the surface material first: for the worked example above that is 3 bulk bags of ballast, 14 cement bags, 151 litres of water and 2 bulk bags of MOT Type 1. Mark the base out 100 mm beyond the shed on all four sides, dig down to roughly the slab thickness plus the sub-base depth, lay and compact the MOT, then pour, lay or deck to the level line. Give concrete 3–7 days before erecting the shed, and settle the permission question early with the Do I Need Planning Permission For A Shed? check before you break ground.
Method and limits
The builder computes base length and width as the shed size plus twice the edge margin, multiplies them for the area, then applies a fixed 10% ordering allowance to concrete, sand and sub-base volumes. Concrete uses C20 (1:5) rates of 2.0 tonnes ballast, 14 × 25 kg cement bags and 160 litres water per m³; paving counts 450 mm slabs on a 10 mm joint pitch (0.2116 m² each) over a 30 mm sharp sand bed at 1.6 t/m³; the MOT Type 1 sub-base uses 75 mm firm, 100 mm soft and 150 mm sloping at 2.0 t/m³ compacted, divided into 0.85 t bulk bags. Timber counts boards from the width and length you enter, laid edge to edge, plus edge boards from the perimeter. Every count rounds up.
- Assumes a rectangular base — length × width only, with no cut-outs, steps or curves; split an L-shape into rectangles and add the two orders together.
- Assumes the ground description you pick — the tool does not test bearing capacity, drainage or clay shrinkage, so a 150 mm sub-base on sloping ground is a planning allowance, not a geotechnical design.
- Does not model joists, footings or reinforcement — a timber frame deck needs its joist size, spacing and support points checked by a supplier or carpenter, and a slab over about 10 m² may need professional sign-off.
- Does not model delivery, price or supplier yield — quantities are physical units; bag weights vary around 0.85 t and slab coverage assumes 10 mm joints.
- Does not decide planning or building regulations — outbuilding rules depend on size, height and position, which is a council question rather than a calculator one.
Figures checked , from sources verified 2026-08-02 and 2026-10-27.
Frequently Asked Questions
How thick should a shed base be?
100 mm of concrete suits most garden sheds, which is why it is the default here; 75 mm works for a small, light shed on firm ground, and 125–150 mm is the range used for workshops, log cabins and bases that will carry equipment. Thickness affects the order directly — on an 8.58 m² base, moving from 100 mm to 150 mm takes you from 0.94 m³ to 1.42 m³, which is 3 bulk bags of ballast and 14 cement bags versus 4 and 20.
Do I need a MOT Type 1 sub-base under a shed base?
For a concrete or paving base, yes in almost every case: 75–100 mm of compacted MOT Type 1 is the standard UK recommendation, and it is what gives drainage and a stable platform so the surface does not crack or settle unevenly. Untick it only if you are building on already firm, well-drained ground, and expect the assessment above to flag that choice on soft or sloping ground.
How much margin should the base have around the shed?
100 mm on each side is the practical default: it gives room for shuttering boards, a spade and any cuts, without wasting material. Going from 0 mm to 100 mm on a 10 × 8 ft shed adds 1.14 m² (from 7.44 m² to 8.58 m²), which is about 0.13 m³ more concrete. 200 mm suits a base you want to walk around or stand pots on.
Is paving easier than concrete for a shed base?
Paving skips mixing and curing: 26 slabs on a 30 mm sand bed can be laid in a day, and a failed slab can be lifted and re-laid. Concrete is stiffer and cheaper per square metre, and gives a shed a firmer floor. Both want the same compacted sub-base underneath, so that half of the order does not change between them.
Do I need planning permission for a shed base?
Usually not for a standard garden shed within permitted development, but it depends on the outbuilding's size, height, position near boundaries and how much of your plot is already built on. Use the CoryVu check at Do I Need Planning Permission For A Shed? first, then confirm with your local planning authority. Separately, GOV.UK's guidance on the permeable surfacing of front gardens notes that impermeable paving over more than 5 m² of a front garden needs permission unless it drains to a lawn, border or soakaway.
Can this tool size the timber frame for a deck base?
No. It counts deck boards and edge boards from the board width and length you enter, and it will not size joists, choose joist spacing or design footings — those are structural decisions that depend on span, load and how the frame is supported. Ask a supplier or carpenter to check the frame before you order timber, and treat this count as a starting quantity for the deck surface.
Sources
- Shed UK – How Thick Should A Concrete Shed Base Be? (75–100 mm standard, 150 mm heavier)
- Concretemath.co.uk – Shed Base Guide (sub-base, thickness, mix)
- Pro-Mix Concrete – Best Concrete Mix UK Guide (C20 1:5)
- Concrete Supply – Concrete Mix Ratio Using Ballast (bags and water per m³)
- Pave Direct – How to Lay a Patio Sub-Base (100 mm Type 1, compaction loss)
- Pave Direct – How to Lay a Patio (8–10 mm joints, 30–50 mm bed, 10% waste)
- MP Moran – Bulk Bag Ballast Specification (0.85 t bulk bag)
- GOV.UK – Guidance on the permeable surfacing of front gardens (5 m² rule)
- Planning Portal – Outbuildings: planning permission
Last updated: 2026-11-13. This page gives an estimate only and is not structural engineering, planning or professional advice.
About this tool
Created and maintained by CoryVu. Read how we check our tools and consult the sources and assumptions on this page.
Something unclear or incorrect? Report an issue.