England and N. Ireland tool

Contract for Buying a House From a Builder

Check a builder's sale contract clause by clause, price the deposit and Stamp Duty, and test your dates before you sign.

Free No sign-up Clause-by-clause SDLT rates Oct 2026

Contract Inputs

Scope: England and Northern Ireland only, using Stamp Duty Land Tax rates published by GOV.UK for purchases from 1 April 2025 and checked on 21 October 2026. Scotland charges LBTT and Wales charges LTT, and neither is calculated here.

Cash Needed Before Completion

Item Calculation Amount
Reservation feeEnter your price and fee above-
Deposit at exchangeEnter your deposit share above-
Stamp Duty Land TaxEnter your price above-
Cash needed before completionReservation fee + deposit + Stamp Duty-
Mortgage needed after depositPrice - deposit-

Stamp Duty Band Breakdown

Band Rate Your Portion Tax
Enter a purchase price to see the bands that apply to you.

How the Readiness Score Is Built

Component Points Basis
Contract protections-Six confirmed clauses, 10 points each
Mortgage offer runway-Offer expiry against estimated completion
Time to exchange-Days left on the reservation deadline
Stage-Unsigned contracts can still be changed
Readiness score-Out of 100

Scenario Analysis

Scenario Cash Needed Mortgage Offer Runway
Your plan--
Completion slips by 3 months--
Builder cuts the price by £5,000--
Deposit raised to 15%--

Your Buying Timeline

1

Reservation paidToday, with the reservation form and fee. Those written terms decide whether the fee is refunded.

2

Exchange deadlineEnter your dates to see the deadline.

3

Mortgage offer expiresEnter your dates to see the expiry.

4

Estimated completionEnter your dates to see completion and the tax due.

5

Snagging inspectionBook it before completion and agree a repair date for every defect you find.

6

Defect cover and structural warranty2-year defects cover and the 10-year structural warranty start on completion day.

Your Contract Checklist

  • Enter your figures to build a clause-by-clause checklist for this contract.

What a Builder's Sale Contract Must Say

GOV.UK lists what every transfer of ownership has to cover: the price, the boundaries, the fixtures and fittings, the rights and restrictions, the planning restrictions, the services and the completion date. Those contents were checked against GOV.UK on 21 October 2026, and they apply to a builder's contract as much as to a resale.

A new-build contract adds 3 items that a second-hand purchase never needs: the plot number, the plans, and a written specification for the kitchen, heating, flooring and insulation. Ask for that specification as an annex to the contract rather than as a brochure page, because an annexed schedule is a term your conveyancer can enforce while a brochure promise is only marketing.

Check the boundaries and any shared access before you sign. If the developer can move a fence, reroute a shared surface or add a second phase of housing behind your plot after you exchange, you want those facts written into the contract instead of explained at the sales office.

Reserve, Exchange, Complete: the Three Stages

Reservation takes the plot off the market for a set period and costs a fee. The £1,000 example used on this page is a starting figure, not a standard rate, and government guidance says a reservation fee may only be refundable in certain circumstances, so your written reservation terms decide whether the money comes back.

Exchange is where the sale becomes binding. GOV.UK states that the agreement is legally binding once contracts are exchanged and that neither side can usually pull out without paying compensation, while MHCLG's buying guidance adds that a buyer who withdraws after exchange may lose the deposit as well.

Many developers ask you to exchange and pay the deposit shortly after reservation, which is why this tool starts at a 42-day exchange window rather than the 5 months GOV.UK quotes as the average UK purchase. Completion often follows 2 to 4 weeks later, and that is the day your mortgage offer has to still be alive.

Long-Stop Dates, Snagging and Warranties

Builds run late. MHCLG's How to buy a home guidance says a long-stop date can be written into the contract, which lets you withdraw from the purchase if the property is seriously delayed. Without one, your only leverage is negotiation, and a 6-month offer against a 9-month build means the offer may have expired before you get the keys.

Snagging is the list of defects you find before completion: a sticking door, a missing threshold, silicone that has already lifted. Agree in the contract that you may inspect before completion and that each item is fixed by an agreed date, because a verbal promise at handover is very hard to enforce afterwards.

A new home carries a 10-year structural warranty and 2 years of general defects cover under the same guidance. Confirm that both policy names, the insurer and the start date appear in the contract, and read what the 2-year cover excludes, because wear and tear normally stays with the owner.

Stamp Duty on a New Home in England and Northern Ireland

Stamp Duty Land Tax applies in England and Northern Ireland only: Scotland charges LBTT and Wales charges LTT, so this page deliberately calculates neither. The rates below are the ones GOV.UK publishes for purchases from 1 April 2025, checked on 21 October 2026.

An ordinary buyer pays 0% on the first £125,000, 2% on the slice up to £250,000, 5% up to £925,000, 10% to £1,500,000 and 12% above that. At £325,000 the tax is £6,250, which is 1.9% of the price, while the same price as an eligible first-time buyer costs £1,250.

First-time buyer relief charges 0% to £300,000 and 5% to £500,000, and it is withdrawn completely above £500,000. If you will still own another home on completion day, a 5% surcharge applies to the whole price — £30,000 on a £600,000 purchase — and GOV.UK refunds that surcharge when the previous home is sold within 36 months of completion.

Common Mistakes When Buying Straight From a Builder

Signing before the protections are confirmed is the expensive mistake: the 6 tick-boxes on this page are worth 60 of the 100 readiness points precisely because they are the clauses that protect you when a build goes wrong.

Treating the brochure as the specification, skipping the long-stop date and assuming the developer's solicitor acts for you are the next three. MHCLG notes that many developers have referral relationships with specific advisers and legal representatives, and that you are under no obligation to use those firms.

Timing mistakes are just as common: a 9-month build against a 6-month offer, an exchange deadline that arrives in 4 days, or a 15% deposit that was never checked against the contract. Line up the 3 dates — offer expiry, exchange deadline and completion — before you commit any money.

Method and limits

The readiness score is built from 3 parts: 6 confirmed protections at 10 points each for 60 points; a mortgage offer runway worth 14 points at 30 or more days spare, 7 points at 0 to 29 days and 0 if the offer expires first; and time to exchange worth 10 points at 21 days or more, 5 points at 7 to 20 days and 0 below 7 days. Stage adds 16 points while the contract is unsigned and 0 once it is exchanged, giving 100 points in total with bands at 85 and 60.

Stamp Duty applies the GOV.UK bands for purchases from 1 April 2025 to each slice of the price, adds first-time buyer relief of 0% to £300,000 and 5% to £500,000, and adds 5% of the whole price when another home is still owned on completion day. Cash before completion is the reservation fee plus the deposit plus the tax, and the deposit is the price multiplied by your entered share.

Dates are counted from today and move in whole calendar months, so a 3-month slip is 3 calendar months rather than 90 days. The offer runway is the offer expiry minus estimated completion, reported in whole days, and the 2-year and 10-year cover dates are measured from estimated completion.

  • Assumes the purchase is your only home or its replacement — if another home is still owned on completion day, the 5% higher rates apply to the whole price instead.
  • Does not model LBTT, LTT or the 2% non-UK-resident surcharge — ask a local conveyancer for a Scottish, Welsh or non-resident figure.
  • Does not read your contract — it records what you say is in it, so a clause you have missed still counts as unconfirmed.
  • Treats the reservation fee as money already spent — it is reported separately from the deposit at risk because refund terms come from your reservation form.
  • Ignores SDLT refunds and reliefs beyond the two above — additional dwellings, shared ownership and non-resident charges need a conveyancer's calculation.

Figures checked .

Frequently Asked Questions

Is a builder's contract the same as buying a second-hand home?

No. A resale contract is drawn up between two owners, while a builder's contract also has to pin down a plot, plans and a specification that do not exist yet, a completion date that depends on the build, and a warranty for defects. GOV.UK lists the standard contents — price, boundaries, fixtures and fittings, rights and restrictions, planning restrictions, services and the completion date — and a new-build contract adds the specification, the long-stop date and the warranty on top of those.

Can I pull out after reserving a new build?

Before exchange, usually yes, but the reservation form decides whether your fee comes back: government guidance says a reservation fee may only be refundable in certain circumstances. After exchange, no. GOV.UK says the agreement is legally binding once contracts are exchanged and neither side can usually pull out without paying compensation, and a buyer who withdraws after exchange may lose the deposit as well.

What deposit does a builder ask for at exchange?

Your contract states it. MHCLG's buying guidance says many developers ask you to exchange contracts and pay a deposit shortly after reserving the property, so the deadline arrives faster than on a resale purchase. The tool starts you at 10% of the price so you can overwrite it with the figure your contract names.

What happens if the builder misses the completion date?

That is what a long-stop date is for. MHCLG's guidance says a long-stop date can be written into the contract, which permits you to withdraw from the purchase in the event of long delays to the property being finished. Without one, your only leverage is negotiation, and your mortgage offer may have expired in the meantime — the same guidance warns an offer may need refreshing because offers usually only last a limited period.

Do I have to use the builder's solicitor and mortgage adviser?

No. MHCLG's guidance notes many developers have referral relationships with specific advisers and legal representatives, and that you are under no obligation to use those firms. Ask for quotes from at least 2 conveyancers and check whether your own lender's panel covers the developer.

When is Stamp Duty due on a new build?

On completion, through your conveyancer, for a purchase in England or Northern Ireland. The tool shows the amount on the day you enter the price so you can put it in your cash plan: at £325,000 as a mover the tax is £6,250, and the same price as an eligible first-time buyer is £1,250.

Sources

Rates and guidance checked 21 October 2026. This page gives an estimate only and is not legal, tax or financial advice.

About this tool

Created and maintained by CoryVu. Read how we check our tools and consult the sources and assumptions on this page.

Something unclear or incorrect? Report an issue.