Book of Days Cross Stitch Planner
Plan a cross stitch project end to end: enter your pattern size, fabric count and stitching pace to get the finished size, session plan and a finish date.
Calculator Inputs
Try a project to see the plan take shape. These replace your inputs and are examples to adjust, not prescribed stitching speeds.
How This Is Calculated
| Step | Formula | Result |
|---|---|---|
| Effective count | Enter fabric count and stitch-over above | - |
| Finished width and height | Enter design width and height above | - |
| Total stitches | Enter design width and height above | - |
| Sessions | Enter stitches per session above | - |
| Weeks | Enter sessions per week above | - |
| Finish date | Enter a start date above | - |
| Fabric to cut | Enter the border above | - |
Week-By-Week Plan
| Week | Ends | Cumulative stitches | Of the design |
|---|---|---|---|
| - | - | - | - |
Each row is the end of a stitching week from your start date. The final row is the week holding the last session.
Scenario Analysis
| Scenario | Finish date | Change | Against target |
|---|---|---|---|
| Your current plan | - | - | - |
| One extra session each week | - | - | - |
| Stitching 20% faster per session | - | - | - |
| Starting two weeks later | - | - | - |
Cross Stitch Project Timeline
Confirm count and cut the fabricCheck the count on the bolt or chart pack, then cut to the size above with the border included.
Start on your entered dateGridding the fabric first saves the miscounts that the contingency insight allows for.
Stitch to the weekly milestonesCheck the cumulative column each week rather than the finish date alone.
Wash, press and blockLeave the days between the last stitch and your target for this, not for more stitching.
Mount or frameOrder the frame at the halfway point so delivery is not the thing that misses the date.
What Is A Book Of Days Cross Stitch Planner?
A book of days is a dated planner rather than a calendar: you write the work into it, day by day. Cross stitchers use one to keep several projects, record where a chart got to, and hold a date for the person the piece is for. The planning question behind every entry is the same three-part sum — how big, how long, by when — and those are the three answers this tool returns.
Counted cross stitch is worked from a chart where one symbol is one stitch, so the chart's own grid is the unit of the job. A design 180 squares wide is 180 stitches wide whatever fabric it lands on; the fabric only decides how much room each stitch takes. That separation is why a size question and a schedule question can be answered from the same two numbers.
How Fabric Count Changes Finished Size
Fabric count is stitches per inch: DMC states that the count "refers to the number of stitches you can make in an inch" and sells Aida from 11 up to 18 count, with 14 count the most popular. A 100 stitch width therefore finishes at 9.1 in (23.1 cm) on 11 count, 7.1 in (18.1 cm) on 14 count and 5.6 in (14.1 cm) on 18 count.
Linen and evenweave are usually stitched over two threads, which halves the effective count: 28 count linen over two finishes at the same size as 14 count Aida, 28 per inch becoming 14. Choose the count by how large the finished piece has to be, then check the fabric you can actually buy in that size.
Planning Stitching Time You Will Actually Keep
A plan built on your best week collapses in your ordinary one. Enter the stitches you finish in a normal sitting and the number of sittings you really do, not the ones you intend to do. At 1,200 stitches a session and four sessions a week you cover 4,800 stitches a week, so a 25,200 stitch chart takes 21 sessions and six whole weeks — six weeks of ordinary life, not five perfect ones.
The week-by-week plan shows the cumulative total for each week, which is the part worth checking: if week 8 still shows 40% of the chart outstanding and your target is in six weeks, the number has told you something before you start stitching. The contingency insight adds 10% to the session count for ripped-back rows and miscounts, which is the cheapest insurance in the whole plan.
Common Mistakes
- Reading a chart's centimetre measurements as stitches. A chart printed at 18 cm wide needs converting with your own count; enter stitches here.
- Stitching 28 count linen over two and expecting 28 stitches per inch. The finished size doubles unless you select over two, which halves it back.
- Cutting fabric to the finished size. The border input exists for this: the cut figure includes it on all four sides.
- Planning the whole project at full speed. Sessions slow down when a design carries confetti or fractional stitches.
- Setting a target date with no slack. A gift framed two days after the last stitch has no room for washing, blocking or a re-stitch.
If You Sell What You Stitch
Work made and sold is trading income, and GOV.UK sets out the registration route for a sole trader and what Self Assessment expects afterwards. Keep the receipts for fabric, frames and postage alongside this plan: the sessions and materials in a piece are the part of the price that is easy to forget.
This planner does not price work. For material and time costs in pounds, use the CoryVu handmade craft price calculator, then compare the price with the sessions counted here.
Stitch Comfortably: Sessions, Breaks And Posture
Long sittings are repetitive work on the same hand and arm. HSE lists repetitive tasks using the same hand or arm action, carrying out a task for a long time, and work breaks or lack of them among the risk factors for musculoskeletal disorders, and describes changing the tools, the pace and the rest breaks as the adaptation.
That guidance is written for work rather than hobbies; read it as a description of the same mechanics. A planned session is a natural point to stop, change position and let your hands come out of the pinch grip — four short sittings a week are easier on hands than two long ones, even at the same weekly total.
Fabric Count Comparison For A 100 Stitch Width
The table below converts one fixed chart width across the counts this planner offers, so you can see the size you are choosing before you buy fabric. Stitched-over-two rows show the effective count, because that is what decides the finished size.
| Fabric | Effective count | 100 stitches wide | 200 stitches wide |
|---|---|---|---|
| 11 count Aida, over 1 | 11 per inch | 9.1 in (23.1 cm) | 18.2 in (46.2 cm) |
| 14 count Aida, over 1 | 14 per inch | 7.1 in (18.1 cm) | 14.3 in (36.3 cm) |
| 16 count, over 1 | 16 per inch | 6.3 in (15.9 cm) | 12.5 in (31.8 cm) |
| 18 count, over 1 | 18 per inch | 5.6 in (14.1 cm) | 11.1 in (28.2 cm) |
| 22 count linen, over 2 | 11 per inch | 9.1 in (23.1 cm) | 18.2 in (46.2 cm) |
| 28 count linen, over 2 | 14 per inch | 7.1 in (18.1 cm) | 14.3 in (36.3 cm) |
| 32 count linen, over 2 | 16 per inch | 6.3 in (15.9 cm) | 12.5 in (31.8 cm) |
Two rows sharing an effective count finish at the same size, which is why 22 count over two and 11 count Aida both give 9.1 in for 100 stitches. The choice between them is about the fabric's look and the thread coverage, not the measurement.
Method And Limits
Every figure on this page comes from the inputs above. The effective count is the fabric count divided by the stitch-over: 28 count over two becomes 14 per inch. Finished width is design width divided by the effective count, giving inches, and centimetres follow by multiplying by 2.54. Total stitches are width multiplied by height. Sessions are the total divided by your stitches per session, rounded up; weeks are the sessions divided by your sessions per week, rounded up.
The finish date is the end of the week holding the final session: your start date plus the whole weeks counted, less one day, because sessions are assumed spread evenly across a week. The cut size adds the border you entered to both sides of both dimensions, so the default 7 cm adds 14 cm to the width and 14 cm to the height. Target slack is the target date minus the finish date in whole days; the plan reads Comfortable at 14 days or more, Tight between 0 and 13 days, and Behind Target when the finish falls after the date.
Three assumptions carry the schedule: your entered pace holds for the whole project, sessions fall evenly across each week, and the fabric is not washed or shrunk before cutting. What is deliberately not modelled is thread and floss quantities, hoop and frame selection, fabric shrinkage when washed, pattern gridding time, backstitch and fractional-stitch timing, and any health or posture assessment. The size is measured from the stitched area alone, so seams and mount overhang are yours to add.
Method reviewed 2026-10-22.
Frequently Asked Questions
How do I work out the finished size of a cross stitch pattern?
Divide the stitch count by the fabric count to get inches, then multiply by 2.54 for centimetres. A 180 stitch width on 14 count is 12.9 in, or 32.7 cm. This page does that for both dimensions at once and also shows the cut size.
What does 14 count mean?
14 stitches per inch. It is a measurement of the fabric, not of your pattern, and DMC recommends it as the most popular starting count.
What does stitching over two mean?
Each cross covers two threads of the fabric, so a 28 count linen works at an effective 14 per inch and finishes at the same size as 14 count Aida. Select over two in the inputs and the size follows automatically.
How much fabric do I need?
Finished width plus twice your border, and the same for height. The default border of 7 cm each side suits a hoop or a simple frame; enter your own figure if you know the mount.
How many stitches should I plan per session?
Enter the number you realistically finish. The plan converts sessions into weeks at your own sessions-per-week rate, so an honest pace gives a date you can keep.
Does this calculate thread or floss?
No. Floss use depends on strand count, coverage, fabric and how a stitcher lays thread, and no single published figure covers those. The tool deliberately limits itself to size and time.
What if I miss a week?
Re-run it with a new start date. The milestone table is a plan rather than a record, and the contingency insight already shows what 10% more sessions does to the finish date.
Can I use this for a bead or full-coverage chart?
The size and schedule arithmetic holds, but full coverage and beading slow the pace; enter a lower stitches-per-session figure rather than a faster one.
Is this medical or posture advice?
No. It is an estimate of size and time. The HSE link in the posture section is workplace guidance about risk factors, not a diagnosis or a treatment recommendation.
Sources
- DMC — Aïda fabric: the count is the number of stitches per inch
- DMC — What fabric should you use for cross stitch? (counted technique, over two)
- HSE — Advice for workers with musculoskeletal disorders
- GOV.UK — Set up as a sole trader
- GOV.UK — Self Assessment tax returns
Last updated: 2026-10-22. This page gives an estimate only and is not legal, tax, financial, medical or professional advice.
About this tool
Created and maintained by CoryVu. Read how we check our tools and consult the sources and assumptions on this page.
Something unclear or incorrect? Report an issue.